Gold Coast Aquatic Centre, Griffith University

Multiblast were engaged by Watpac Constructions to carry out the concrete honing & sealing to the pool surround of the brand-new Gold Coast Aquatic Centre, at Griffith University. Featuring an Olympic size swimming pool, the entire 1,600 sq.m surrounding concourse was honed to fully expose a multitude of coloured stones – Hanson ImageCrete Colorado.

Being a pool surround and a high traffic ‘wet’ area, safety was of utmost importance. The slip-resistance achieved will ensure the safety of all pool-goers, whilst the ‘wet-look’ penetrating sealer has given the concrete finish vibrant colour and depth, whilst offering great protecting from staining.

Multiblast were required to overcome numerous challenges to provide the quality finish that such a project deserved. Battling the extreme outdoor weather conditions of one of the hottest summers on record, our experienced team powered through to get the job completed on time. We have since received the praise of Watpac, Griffith University and the Brisbane City Council, who are all extremely satisfied with the finish provided by Multiblast.